You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Kali Cakung Lama Menunggu Ketersediaan Rusun

Normalization in Cakung Lama Awaits Relocation Process

Normalization in Cakung Lama River that crosses six urban villages and three sub-districts in North Jakarta had to be postponed after people in the riverbank relocated to flats.

We cannot do normalization before relocation plan to the flat is done

North Jakarta Water Resources Sub-dept. Head, Herning Wahyuningsih said, in Cipinang Lama River, there are thousands of citizen settlements stood atop the riverbank. Due to this condition, her sub-dept. cannot normalize the river as wide as 20 meters and dredge up to 15 meters depth.

Several Areas Flooded by Cakung Lama River

"We cannot do normalization before relocation plan to the flat is done," she stated, Monday (2/20).

She expressed, until now, inundation points in North Jakarta have begun to diminish in line with the incessant normalization toward connecting channels (PHB), rivers and drains.

Some inundation points that are still exist such as Jalan RE Martadinata, precisely in front of Tanjung Priok Harbor's Gate III and settlement on Cakung Lama riverbank.

"Cakung Lama River has narrowed from 20 meters becomes 3-5 meters width," he disclosed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
close